38.8 C
Delhi
Tuesday, July 8, 2025

L&T construction wins orders for power transmission & distribution business

Date:

Share post:

Donate-GC-Razorpay

Mumbai: L&T Construction on Thursday said its Power Transmission & Distribution business (PT&D) has secured key orders in the Middle East region.

In the United Arab Emirates, the business has received an order for engineering, supply, construction, installation, testing, and commissioning a 400/132 kV substation. The scope also includes associated transformer, reactor, and substation control and monitoring systems (SCMS).

In Kuwait, the business has won an order to establish 400kV overhead transmission lines along with associated 400kV underground cable interconnections. This transmission segment of more than 100 km in route length will help evacuate and generate power.

Additional orders have been won in ongoing substation orders in the region, a company statement said.

Related articles

Are Minorities in Danger in India?

Let’s not beat around the bush.The claim that “minorities are in danger in India” has been repeated so...

Bridges of Trust and Tango: PM Narendra Modi’s Historic Visit to Argentina

A Dance of Democracy and DignityAs the aircraft carrying Prime Minister Narendra Modi descended upon Ministro Pistarini...

BRICS 2025 in Brazil: A Rising Bloc and India’s Expanding Footprint

An Emerging Continent, A Rising CoalitionAs the turquoise waves kissed the shores of Rio de Janeiro and the...

Musk is “completely off the rails” with his third party idea: Trump

Washington: The differences between Donald Trump and Elon Musk have widened further after the US President called Tesla...